So I wont repost what was lost but have these all with the first coat of sealer (thinned spar varnish) on them this morning so that will get sanded back to wood tomorrow and be repeated another twice before the oil finish is started. It will be about 2-3 weeks to get them and the sheaths done and they can be shipped off. Two for here with the 2nd from the right for Glen and 5th from the right for Mike.

Comment