02-03-2023, 02:51 PM
I'm working on releasing the second generation of my hinged floorplate bottom metal, after certain material shortages I redesigned it to use components that are available for now.
I expect the first batch to be in house next week. As a possible bonus the redesigned prototype I have holds 5 rounds this time but I may lower the capacity back to 4 to preserve feeding reliability and ease of loading.
I expect the first batch to be in house next week. As a possible bonus the redesigned prototype I have holds 5 rounds this time but I may lower the capacity back to 4 to preserve feeding reliability and ease of loading.

